HIVE DIGITAL TARGETS 35 EH/S IN 2026
Today @HIVEDigitalTech announced a definitive agreement to expand its hydroelectric-powered data center campus in Yguazú, Paraguay, adding 100 MW and bringing the site’s total renewable capacity to 400 MW.
Powered by the Itaipú Dam, this Phase 3 expansion is expected to elevate HIVE’s global Bitcoin mining capacity to 35 EH/s by 2026, solidifying its position as a leader in sustainable digital infrastructure.
Concurrently, through a strategic partnership with @Bell, $HIVE aims to increase its #HPC and #AI operations fivefold, integrating $BUZZ #HPC’s sovereign AI cloud infrastructure with @Bell national network, enabling secure, renewable-powered AI and blockchain computing across Canada and beyond.

58,87 rb
283
Konten pada halaman ini disediakan oleh pihak ketiga. Kecuali dinyatakan lain, OKX bukanlah penulis artikel yang dikutip dan tidak mengklaim hak cipta atas materi tersebut. Konten ini disediakan hanya untuk tujuan informasi dan tidak mewakili pandangan OKX. Konten ini tidak dimaksudkan sebagai dukungan dalam bentuk apa pun dan tidak dapat dianggap sebagai nasihat investasi atau ajakan untuk membeli atau menjual aset digital. Sejauh AI generatif digunakan untuk menyediakan ringkasan atau informasi lainnya, konten yang dihasilkan AI mungkin tidak akurat atau tidak konsisten. Silakan baca artikel yang terkait untuk informasi lebih lanjut. OKX tidak bertanggung jawab atas konten yang dihosting di situs pihak ketiga. Kepemilikan aset digital, termasuk stablecoin dan NFT, melibatkan risiko tinggi dan dapat berfluktuasi secara signifikan. Anda perlu mempertimbangkan dengan hati-hati apakah trading atau menyimpan aset digital sesuai untuk Anda dengan mempertimbangkan kondisi keuangan Anda.